{% if user %}{{ user.fullname | escape }}{% endif %}
💾 Saved LAs (local):
☁️ Saved LAs (online):
Customer Details
Preliminary Questions
When assessing for a new ASHP, select 'No' — the existing boiler circuit will be disconnected.
When assessing for a new ASHP, select 'No immersion heater' — any existing immersion circuit will be disconnected.
e.g. EVCP, Battery Inverter, Hot Tub (hard wired), Storage Heating etc.
Standard CU Circuits
#
CU
Phase
Load Type
Label
MCB (A)
Demand (A)
Action
High Usage Appliances (no diversity)
Please enter High Usage Appliances in kW where possible.
#
CU
Phase
Pos.
Appliance
Label
Rating
Demand (A)
Action
New Equipment (Net Zero additions)
Equipment proposed for installation. Added at full stated demand. EV Chargers support an optional Load Management Device (LMD) to cap contribution. Please enter New Equipment in kW where possible.
#
Phase
Type
Model / Notes
Rating (A)
Demand (A)
Action
💾 Saved Designs (local):
3-Phase Consumer Unit Designer
Build a proposed three-phase board layout using
the same load catalogue and calculation engine
as the Maximum Demand Calculator.
Design Details
Preliminary Questions
Proposed Circuits
Circuit Schedule
No circuits added yet.
Design Results
Add circuits to begin the design.
Board Layout
No board layout generated yet.
{% if user %}{{ user.fullname | escape }}{% endif %}{% if user %}{{ user.firstname | escape }}{% endif %}{% if user %}{{ user.lastname | escape }}{% endif %}{% if user %}{{ user.emailaddress1 | escape }}{% endif %}